Skip to content

doc: move to redesign #95065

doc: move to redesign

doc: move to redesign #95065

Triggered via pull request October 26, 2026 21:47
Status Failure
Total duration 45m 26s
Artifacts –

test-linux.yml

on: pull_request
Matrix: test-linux
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 2 notices
test-linux (ubuntu-24.04-arm)
Process completed with exit code 2.
test-linux (ubuntu-24.04-arm): test/parallel/test-inspector-connect-to-main-thread.js#L0
Command: out/Release/node /home/runner/work/node/node/node/test/parallel/test-inspector-connect-to-main-thread.js --- CRASHED (Signal: 6) ---
sccache stats - test-linux
72% - 3651 hits, 1420 misses, 0 errors
sccache stats - test-linux
83% - 4233 hits, 848 misses, 0 errors