Skip to content

ci: trigger dtq-dev-93 daily UI tests - #1745

Merged
Kasinhou merged 1 commit into
dtq-devfrom
ci/trigger-ui-tests-dtq-dev-93
Nov 19, 2026
Merged

Kasinhou merged 1 commit into
dtq-devfrom
ci/trigger-ui-tests-dtq-dev-93

Conversation

@Kasinhou

Copy link
Copy Markdown

Problem description

Related: https://github.com/dataquest-dev/dspace-customers/issues/1024

dtq-dev-93 has no nightly UI tests. Its playwright-tests.yml (instance 8603 on dev-6, NAME=LINDAT-9) runs only after a deploy, because GitHub runs scheduled workflows only from the default branch.

Analysis

Add dtq-dev-93 to the list in trigger-ui-tests.yml on dtq-dev, the same way dtq-dev-767-base was added in #1728. The nightly job (02:15 UTC) then runs gh workflow run playwright-tests.yml --ref dtq-dev-93, which uses the workflow from dtq-dev-93 (restored in #1736).

Problems

None. If dtq-dev-93 is deleted later, this line has to be removed, otherwise the dispatch for that branch fails.

🤖 Generated with Claude Code

Schedules run only on the default branch, so the nightly Playwright run for
dtq-dev-93 (instance 8603 on dev-6) has to be dispatched from dtq-dev, the
same way as dtq-dev-767-base.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
@Kasinhou Kasinhou self-assigned this Nov 19, 2026
@Kasinhou
Kasinhou requested a review from jr-rk November 19, 2026 15:54
@Kasinhou
Kasinhou merged commit 5c74ed4 into dtq-dev Nov 19, 2026
4 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants