Skip to content

phase switch delay: fix consideration of own reserved required power - #3666

Merged
LKuemmel merged 2 commits into
openWB:masterfrom
LKuemmel:fix_phase_switch
Jul 15, 2026
Merged

LKuemmel merged 2 commits into
openWB:masterfrom
LKuemmel:fix_phase_switch

review

f4319db
Select commit
Loading
Failed to load commit list.
Sign in for the full log view

The logs for this run have expired and are no longer available.